TRU is proud to lead the way in sustainability with the Low-Carbon District Energy System (LCDES). This major infrastructure project will eventually connect campus buildings to an innovative heat pump system — replacing natural gas boilers and significantly reducing TRU’s carbon footprint.

Construction timeline and key impacts

TRU is laying groundwork for its clean-energy system, with pipe installation and retrofits underway.

As part of this work, the following construction activities are underway or scheduled. Please follow onsite signage and allow extra time to navigate areas safely.


Hear from one of our co-op students as they share how the Low-Carbon District Energy System is already shaping their campus experience.

Administrative Services Building (AB) / Campus Drive

  • Construction: Concrete curb will be fully paved by Sept. 27.

Arts and Education Building (AE)

  • Accessibility and closures:
    • Accessible path from Lot H to Student Union Building (SUB) is closed until Oct. 20. Use the back of AE to reach Campus Commons.
    • Path around AE is closed for hydrovac work until Oct. 4.
  • Construction work:
    • Pipe laying and welding at the front of AE until Oct. 16.
    • Fencing and civil work along sides of AE with pedestrian controls in place.
    • Evening and weekend x-ray and welding at AE entrance.
  • Hydrovac:
    • Work around AE (equipment noise expected) to Oct. 4.

Clock Tower (CT) and Old Library Administration and Research Annex (OLARA)

  • Sod installed, walkway and retaining wall work ongoing to Oct. 4. Please avoid grass and active work zones.

Gym (College Drive) / Lepin Building

  • Closures: Backfilling Sept. 27; paving Oct. 4. Ongoing work in Gym stairwell until Oct. 10 for infrastructure upgrades and tie-in.
  • Pedestrian access: Use detour path around buildings (maintained).
  • Drivers: Watch for equipment and expect short detours.

House 4 and 5 (Sk’lep Trail)

  • Accessibility: Path improvements scheduled in Oct. Some unpaved areas remain — allow extra time.

House of Learning (HL) / Sustainability Powerhouse

  • Hydrovac: Exploratory hydrovac Sept. 20 – Oct. 6 between HL and Sustainability Powerhouse site. Walkways remain open but may have detours. Noise expected.

Old Main (OM)

  • In-building pipe retrofits (to Oct. 25):
    • Visual Arts wing – all LCDES pipe installed; patching and painting begin next week.
    • Faculty/occupant consultation ongoing. Classroom schedule updates to follow.
  • Accessibility:
    • Paved accessible path between International Building and Old Main now open.

Student Union Building (SUB) / Campus Activity Centre (CAC)

  • Fencing / trenching: Ongoing behind SUB toward Lot H.
  • Hydrovac: Exploratory hydrovac at CAC / SUB — expect noise impacts.
  • Parking: Three reserved stalls from Lot H have been relocated to Lot J.

Parking

  • Lot P (by the Human Resources Building / future Indigenous Centre site):
    • Excavation and hydrovac starting Oct. 3 for 6 – 8 weeks. Lot partially accessible; flaggers onsite.
    • No full return loop access — enter / exit from same entrance.
    • Ten stalls have been reserved for President’s office.
    • Alternating lane access will begin in coming weeks.
    • Expect intermittent closures and hydrovac noise impacts.
  • Lot H:
    • Four stalls closed for construction.
    • Reserved parking moved to Lot J.
    • Expect further decreases as trenching expands.
  • Lot J:
    • Hosting relocated reserved stalls from Lot H.
  • Lot C:
    • Work complete.
  • Lot Q:
    • Use for visitor and short-term parking.
  • Parking notices:

Stay informed

Visit this page regularly for updates, closure notifications and progress reports. For inquiries or feedback, email us at zerocarbon@tru.ca.

Thank you for your patience as we enhance our campus. Please note that work and impact dates are subject to change.

TRU's bold journey to zero carbon

TRU is on the brink of a monumental achievement—progressing toward our ambitious goal of zero carbon! How? Together with our partners, Creative Energy, known for innovative district energy solutions, and BC Hydro, we are building a cutting-edge Low-Carbon District Energy System (LCDES) on our Kamloops campus.

The LCDES is the most ambitious energy project in TRU’s history and replaces our old natural gas boilers with a sustainable electrical heating source, making our campus greener than ever by offsetting over 100,000 tonnes of greenhouse gas emissions over the next 30 years—this is like planting a 4,000-acre forest, a space 16 times larger than our own campus.

TRU will be one of the first universities in North America to hit zero carbon.

With the LCDES, TRU continues to demonstrate our commitment toward building a greener future and as a leader in what true sustainability looks like.

Starting in fall 2024

Get ready for the future!

The building of LCDES will be starting in fall 2024 and includes the construction of the Sustainability Powerhouse, a marvel of modern engineering located in the heart of the Kamloops campus.

Half of this building will be an energy plant and serve as a "living lab," showcasing cutting-edge electrically powered air-source and water-source heat pumps along with backup natural gas boilers. Heat will be generated here and pushed throughout the campus in underground pipes to 13 existing buildings: Arts and Education, Administrative Services Building, Campus Activity Centre, Clock Tower, Culinary Arts Training Centre, Brown Family House of Learning, Indigenous Education Centre, International Building, Ken Lepin Science and Health Sciences Building, North Tower Residence, Old Library Administration and Research Annex (OLARA), Old Main and TRU Gymnasium.

The other half of the Powerhouse will host the new offices of the award-winning TRU Sustainability Office.

See below to learn more about milestones and construction updates.

View Milestones

Powering up with strong partnerships

Our sustainability journey is powered by remarkable partnerships.

Creative Energy and BC Hydro have been instrumental in pushing this clean energy initiative forward. Together, we’re making a real difference.

Cutting-edge heating solutions

The Sustainability Powerhouse will be a marvel of modern engineering.

The Sustainability Powerhouse will feature air-source and water-source heat pumps that provide a renewable energy heating source. Natural gas boilers will be on standby for backup, ensuring resilience and uninterrupted operations. An underground closed-loop distribution system will weave through the campus, connecting buildings to the LCDES and allowing us to retire our old boilers.

Expansion potential: building a greener tomorrow

But we’re not stopping there.

A second phase of the LCDES has been proposed to connect an additional five buildings and further decarbonize campus spaces. In the future, new TRU buildings and nearby City of Kamloops buildings, like the Tournament Capital Centre and the Canada Games Aquatic Centre, along with buildings in The Reach development on campus, could also connect to the system. Additional low-carbon generation capacity and thermal energy storage can be added to the LCDES, providing renewable infrastructure for future growth.

FAQ's

When will major construction begin?

Site preparation for the LCDES Sustainability Powerhouse near Old Main will begin on Mar. 18, followed by excavation and deep civil work starting Mar. 24.

Will parking be impacted?

Yes, throughout the project, some parking areas will be temporarily closed. Detours and alternate parking options will be provided. Any affected permit holders will be informed in advance of any closures and alternative parking options.

Who can I contact with questions?

For inquiries or feedback, email us at carbonneutral@tru.ca.

Be a Hero for Zero

Support a zero-carbon future with a donation and have your name honoured in the Sustainability Powerhouse.

Milestones on our journey

2021

  • Engaged in public consultation on the LCDES.

2023

  • Received approval for the first phase from the BC Utilities Commission.

  • Conducted public consultation on the proposed second phase.

2024

2030

  • Once the project is complete, emissions (from heating buildings using natural gas) will be reduced by 95% compared to 2020 levels.

Stay tuned for project updates and progress

Stay tuned for construction updates and more information about the LCDES project. This major initiative will significantly reduce our environmental impact and set the stage for a sustainable tomorrow.